<dd id="zkfju"><track id="zkfju"></track></dd><tbody id="zkfju"></tbody>

    Integrity Test cobetter.jpg

    The integrity of the sterilised filter should be tested and recorded immediately after use by anappropriate method. The common methods include Bubble Point test, Diffusion Flow test or Pressure Hold test.

    Testing Principle

    Bubble Point Test

    When the filter membrane is wetted bt a proper liquid; the liquid will be held in the pore of the filter by surface tension and capilary forces. The minimum pressure required to force liquid out of the biggest pores is a bubble point pressur. The formula is as followed;

    Diffusion Flow Test/Pressure Hold Test

    At the 80% pressure of the minimum bubble point, the gas flow rate is measured diffusing through the liquid-filled pores of a wetted membrane to downstream.

    Water Intrusion Test

    Under a low differential pressure, the amaller flow is squeezed into the filter membrane to form a certain flow rate despite of the preventing force caused by a hydrophobic membrane.

    免费一级无码婬片AA片高潮喷水,91久久综合亚洲鲁鲁五月天,97人妻人人揉人人躁人人